Skip to content Skip to main menu

Major Achievements

HOME > Major Achievements >

Basic and detailed design for a water purification facility in the lower Han River (secondary) water supply system adjustment project

Owner
K-water
Period
Mar. 2009 - Dec. 2011
Place
Maesonggosaek-ro 503beon-gil, Maesong-myeon, Hwaseong-si, Gyeonggi-do
Area
260,000 ㎥/day
Purpose
Stable water supply through water supply system adjustment to the cities of Pyeongtaek, Hwaseong, Anseong, and Osan that are expected to have a water shortage in the future by utilizing the excess wat
Range
Details
TOP